14 02, 2017

Waste Water Pilot Plant

One of Port’s recent projects was building a Waste Water Pilot Plant for a client in Queensland. The main purpose for this container is to supply and run a pilot plant that is fed primary influent (wastewater). This modified container will be an integral part of the plant which provides protection from the environment, maintains a climate controlled temperature and provides support for equipment.

17 01, 2017

Car Wash Container Office

Port Containers was contracted to build a shopfront / waiting room for Blue Star Hand Car Wash who has just recently opened there latest store in Newcastle at the Kotara Homemakers Centre. As a family run business who have a number of car wash businesses in other locations, they needed a place for their customers to book their cars in and have the ability to wait while there car was cleaned. Port was able to design, construct and deliver their Car Wash Container Office so they could start operating immediately servicing up to 60 customers a day.

12 12, 2016

Shipping Container Kiosk

Built for Wollongong City Council, this 40ft (12m) Kiosk was constructed out of a High Cube Shipping Container. This unit can be easily transported site to site and set up in no time at all. Perfect for work sites, festivals and permanent placements such as holiday parks, the container park can be used for a large range of applications.

15 08, 2016

60ft Switch Room

Connected by a Joining Kit, these two containers create a 60ft Switch Room! Port Containers were contracted by Brightwater to build a 60ft (20m) Switch room Container. Brightwater is an industrial engineering solutions provider to Australasia’s Resources, Industrial Energy, Quarry & Minerals and Wood & Forestry sectors.

12 07, 2016

Fire Training Unit

This 'Mod of the Month' consists of a modified 20ft and 10ft shipping container with joining kit to create a facility built specially for Fire Training. Intended to create more of a 'live' fire scenario in order to train staff more effectively. There are multiple entry points including access hatches built into the web-forge platforms on the roof, internal & external staircases and heavy duty doors. The outside is equipped with a smoke machine entry point, a simulation meter box and bollards for harness equipment. The roof is in two parts, one part tin and one part tile. The interior and exterior surfaces are coated in fire proof paint in jet black for low visibility training.

Go to Top